BITU-RAP
is applied horizontally
beginning 2" from
the top of the
wall and extending
to the bottom overlaps
should be a minimum
of 2".
Termination
at the top of the
wall shall be counter
flashed with a separate
4" wide
stripof BITU-RAP.
Bottom
termination shall
extend over a separate
strip of BITU-RAP
which will be placed
over the footing to
the edge and 4"-6" up
the vertical wall.
|